With the integration and upgrading of the building materials and home furnishing market, the concept of whole-house stone customization has been accepted by many consumers, especially among the wealthy population in society, whole house stone customization has become a symbol of luxury homes. Whole house customization has evolved from simple stone lines to the overall background, achieving preliminary integration from line to surface. The application of door openings, wall panels, wine cabinets, stairs, bathrooms, and other public areas derived from the overall background has achieved a high degree of integration from the surface to the overall space.

Design Workflow

1、 Communication

1. Before initial quantity: Communicate with sales personnel

Communication content: The customer’s information about the material, style, general category and quantity of the product, their personality preferences, an appointment for measurement time, customer address, and relevant personnel who need to be present.

2. During the measurement process, communicate with the client or construction manager about the specific project content, quantity, special requirements, suggestions, and plans for rectification.

2、 Measurement

1. Category measurement:

Door measurement. Communicate with the construction party or client first before measuring, take notes with markers in areas where the door opening will not be covered, and finally copy.

Recording standard: opening size.

1. Key points and precautions for measuring categories

a. Elevation; b. Position against the wall; c. Doors and covers with lintels and hats, pay attention to floor height and corners;

d. Pay attention to the distance between the sleeve line and the wall and other sleeves; e. Pay attention to the size error of each face of the opening;

f. Pay attention to the special requirements of customers for product dimensions; g. Please indicate the opening direction;

h. Pay special attention to the hinge position and wall thickness of outdoor windows when measuring window covers; i. If the sliding door requires the track box not to be lifted downwards, pay attention to calculating the height of the door opening;

j. Pay attention to the installation method of hidden doors and hidden sliding doors with external sliding doors; k. Pay attention to the size and shape of the door opening required for the shape of the pass.

2. Measurement of wall panels:

Wall panel measurement: First, record the dimensions in a prominent area on the wall, and finally copy them

Recording standard: Mark nodes on the wall for small and total sizes, special shapes

Key points and precautions for measuring wall panels

a. Elevation; b. All dimensions inside the entire space must be recorded; c. Communicate floor materials and skirting materials

d. Pay attention to the center point position of the ceiling; e. Pay attention to the mutual relationship between the heights of each floor; f. Communicate the specific materials used for each wall surface

g. Pay attention to the materials used for the corner lines; h. Pay attention to the positions that need to be modified during foundation construction

I. Pay attention to the final position of the door or window opening; j. Pay attention to the measurement method for the size of the external corner column

3. Cabinet measurement:

Cabinet measurement

a. Pay attention to subtracting the thickness of wall tiles from the first measurement of cabinets and washbasins, paying attention to the position of door frames, and paying attention to the inlet and outlet water levels;

b. Position of underfloor heating water distributor, pay attention to the position and height of the ceiling, pay attention to the position of smoke exhaust pipes, and the position of power sockets

c. When measuring the wardrobe in the cloakroom, attention should be paid to the height and position of the ceiling, as well as the position of the light source or socket

d. The wine cabinet needs to pay attention to whether the light source and water level are reserved

4. Measurement of stairs;

Staircase measurement

a. Right angle stairs: step height, step width, step length, corner, and platform width; b. Rotating stairs: step height, step width, step length, corner and platform width, curvature layout, twisting and flattening iron layout;

c. Overall staircase: staircase length, width, height, beam height, and platform height; d. Adjust the first step of the staircase to an odd number, and the height of the first step without running the staircase should not exceed 150;

e. Pay attention to the triangle board and baseboard; f. Pay attention to whether there are wooden finishes or other materials on the wall.

3、 Drawing deepening

According to on-site measurements, adjust the proportion and quantity of wall panels for each wall to achieve the best effect. Cabinet type cabinets are defined based on their functional location and style, and standard styles are called for application. The preliminary design of staircase-type stairs will only include single-sided drawings and reference images. The ceiling type will be adjusted according to the layout plan and the detailed drawings of the facade.

4、 Notes on deepening drawings

5、 Plan discussion

Explain the characteristics of the deepened plan to the client in a professional manner, and do not modify the plan completely according to the client’s wishes. Explain to the client the current conflicts in construction.

6、 Plan modification

When the plan needs to be modified, the time should not be too long. The key questions and areas of customer dissatisfaction should be further developed into two or more solutions.

7、 Preliminary quotation

Standard format for quotation list: Display the location, specifications, quantity, unit price, and total price. The quantity in the quotation list should not deviate too much from the drawings and should be as accurate as possible

8、 Business negotiations

Designers avoid discussing prices with customers and assisting sales personnel in signing orders

9、 Produce basic drawings

According to the requirements of the exhibition hall design, technical disclosure is required when submitting simple and detailed basic drawings to the construction party, and the construction party needs to sign and leave a record of the foundation. Only on-site supervision is required during the construction process

10、 Compound ruler

According to the above dimensional requirements and taking photos on site for reference, if there is any inconsistency with the basic dimensions, it is necessary to communicate with the construction party promptly for rectification

11 detailed drawings

After the refinement of the drawings, if there are any adjustments to the plan that need to be confirmed by the customer, they must be confirmed. For example, if any changes in the project are inconsistent with the basic dimensions, it is necessary to communicate with the construction party promptly for rectification

12 Break down the order

13 Production Supervision

Designers are so familiar with their designed products that no one can fully supervise the craftsmanship, style, and materials.

14 Installation guidance

Disclosure of installation height of wall panels for special locations

15 Completion acceptance and archiving

Designers should play a responsible role in ensuring perfect effects, and it is necessary to keep a background in case photography

16 Engineering Summary

Summary of customer evaluations of designers, deficiencies in actual results, and post-event summaries of errors

Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn
sntstone

Don't go away, more surprises!!

Product Inquire

We will contact you within 1 working day, please pay attention to the email with the suffix “@sntstone.com”